Our references
Specifications
Contractor | Interoute |
Date | June 2015 |
Difficulty | Work into the swell! |
Note
The aim of the project is to make the burial and maritime anchor 2 fiber optic cables at about 2.50 m below the level of the sand and therefore between 3 and 4 m below the water level, a distance of from 50ml from the beach.