FR EN
Our references
  • Types of item
    • Slide rail systems
    • Trench boxes
  • Types of job
    • Laying of pipe
    • Laying of precast elements
    • Laying of tank
    • Laying of guide comb
    • Repair works
  • Continents
    • Oceania
    • South America
    • North America
    • Africa
    • Europe

TAHITI

Tahiti - North Island
Specifications
Contractor Interoute
Date June 2015
Difficulty Work into the swell!
Note

The aim of the project is to make the burial and maritime anchor 2 fiber optic cables at about 2.50 m below the level of the sand and therefore between 3 and 4 m below the water level, a distance of from 50ml from the beach.