Our references
>
Specifications
Client | Razel Bec |
Year | Jully 2013 |
Type of work | Stormwater drainage |
Note
Subterranean crossing the main access to the Marseille-Provence airport for the transfer of stormwater retention pond.
Main problem: keeping active circulation to the airport.
Products used