Our references
>
Specifications
Contractor | RAZEL BEC |
Date | March 2015 |
Particularity | Width up to 10m |
Note
As part of the construction of the roundabout Vincent Badie in Beziers, the General Council of the Hérault planned 3 hoppers construction to manage rainwater.
The purpose of the pool is twofold since it must allow one hand to storm basin office with leakage rate and secondly, to fulfill the role of a containment basin for storage of accidental pollution occurred on floor.
An ambitious and responsible project that represents an amount of 13 million euros.
A project especially that must be irreproachable since this axis move sees 50,000 vehicles / day!
Products used